[1] S.-S. Liu, C.-J. Wang, Profit optimization for multiproject scheduling problems considering cash flow, Journal of Construction Engineering and Management, 136(12) (2010) 1268-1278.
[2] A.M. Elazouni, F.G. Metwally, Expanding financebased scheduling to devise overall-optimized project schedules, Journal of Construction Engineering and Management, 133(1) (2007) 86-90.
[3] A. Senouci, K. El-Rayes, Time-profit trade-off analysis for construction projects, Journal of Construction Engineering and Management, 135(8) (2009) 718-725.
[4] D.X. Zheng, S.T. Ng, M.M. Kumaraswamy, Applying a genetic algorithm-based multiobjective approach for time-cost optimization, Journal of Construction Engineering and management, 130(2) (2004) 168-176.
[5] J. Son, T. Hong, S. Lee, A mixed (continuous+ discrete) time-cost trade-off model considering four different relationships with lag time, KSCE Journal of Civil Engineering, 17(2) (2013) 281-291.
[6] A. Kandil, K. El-Rayes, Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects, Journal of Construction engineering and Management, 132(5) (2006) 491-498.
[7] V. Valls, F. Ballestin, S. Quintanilla, A hybrid genetic algorithm for the resource-constrained project scheduling problem, European Journal of Operational Research, 185(2) (2008) 495-508.
[8] S.-S. Leu, C.-H. Yang, GA-based multicriteria optimal model for construction scheduling, Journal of construction engineering and management, 125(6) (1999) 420-427.
[9] J.E. Kelley Jr, Critical-path planning and scheduling: Mathematical basis, Operations research, 9(3) (1961) 296-320 .
[10] C. Hendrickson, C.T. Hendrickson, T. Au, Project management for construction: Fundamental concepts for owners, engineers, architects, and builders, Chris Hendrickson, 1989.
[11] A. Pagnoni, Project engineering: computer-oriented planning and operational decision making, Springer Science & Business Media, 2012.
[12] M.S. El-Abbasy, T. Zayed, A. Elazouni, Finance-based scheduling for multiple projects with multimode activities, in: Construction Research Congress 2012: Construction Challenges in a Flat World, 2012, pp. 386-396.
[13] J.W. Fondahl, A non-computer approach to the critical path method for the construction industry, (1962).
[14] W. Prager, A structural method of computing project cost polygons, Management Science, 9(3) (1963) 394-404.
[15] N. Siemens, A simple CPM time-cost tradeoff algorithm, Management science, 17(6) (1971) B-354-B-363.
[16] O. Moselhi, Schedule compression using the direct stiffness method, Canadian Journal of Civil Engineering, 20(1) (1993) 65-72.
[17] K. El-Rayes, O. Moselhi, Resource-driven scheduling of repetitive activities, Construction management & economics, 16(4) (1998) 433-446.
[18] K. El-Rayes, D.H. Jun, Optimizing resource leveling in construction projects, Journal of Construction Engineering and Management, 135(11) (2009) 1172-1180.
[19] T. Hegazy, Optimization of resource allocation and leveling using genetic algorithms, Journal of construction engineering and management, 125(3) (1999) 167-175.
[20] W.-T. Chan, D.K. Chua, G. Kannan, Construction resource scheduling with genetic algorithms, Journal of construction engineering and management,122(2)(1996) 125-132 .
[21] K. El-Rayes, A. Kandil, Time-cost-quality tradeoff analysis for highway construction, Journal of construction Engineering and Management, 131(4) (2005) 477-486.
[22] M. Tsai, T. Hong, T. Liu, Two-dimensional encoding schema and genetic operators, in: Proceedings of the 9th joint conference on Information Sciences, JCIS 2006, 2006.
[23] S. Shadrokh, F. Kianfar, A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, European Journal of Operational Research, 181(1) (2007) 86-101.
[24] M. Abido, A.M. Elazouni, Multiobjective evolutionary finance-based scheduling: Entire projects’ portfolio, Journal of Computing in Civil Engineering, 25(1) (2010) 85-97.
[25] A. Alghazi, A. Elazouni, S. Selim, Improved genetic algorithm for finance-based scheduling, Journal of Computing in Civil Engineering, 27(4) (2012) 379-394.
[26] S. Hossein Hashemi Doulabi, A. Seifi, S.Y. Shariat, Efficient hybrid genetic algorithm for resource leveling via activity splitting, Journal of Construction Engineering and Management, 137(2) (2010) 137-146.
[27] R. Sonmez, Ö.H. Bettemir, A hybrid genetic algorithm for the discrete time–cost trade-off problem, Expert Systems with Applications, 39(13) (2012) 11428-11434.
[28] R. Sonmez, F. Uysal, Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem, Journal of Computing in Civil Engineering, 29(5) (2014) 04014072.
[29] T.J. Hindelang, J.F. Muth, A dynamic programming algorithm for decision CPM networks, Operations Research, 27(2) (1979) 225-241.
[30] S.-S. Leu, C.-H. Yang, J.-C. Huang, Resource leveling in construction by genetic algorithmbased optimization and its decision support system application, Automation in construction, 10(1) (2000) 27-41.
[31] A. Khalafallah, M. Abdel-Raheem, Electimize: new evolutionary algorithm for optimization with application in construction engineering, Journal of Computing in Civil Engineering, 25(3) (2010) 192-201.
[32] X. Yang, J. Yuan, J. Yuan, H. Mao, A modified particle swarm optimizer with dynamic adaptation, Applied Mathematics and Computation, 189(2) (2007) 1205-1213.
[33] D.X. Zheng, S.T. Ng, Stochastic time–cost optimization model incorporating fuzzy sets theory and nonreplaceable front, Journal of Construction Engineering and Management, 131(2) (2005) 176-186.
[34] Ö.H. Bettemir, M.T. Birgönül, Network analysis algorithm for the solution of discrete time-cost tradeoff problem, KSCE Journal of Civil Engineering, 21(4) (2017) 1047-1058.
[35] H.K. Park, S.H. Han, J.S. Russell, Cash flow forecasting model for general contractors using moving weights of cost categories, Journal of management in Engineering, 21(4) (2005) 164-172.
[36] S.-S. Liu, C.-J. Wang, Profit optimization for multiproject scheduling problems considering cash flow, Journal of Construction Engineering and Management, 136(12) (2010) 1268-1278.
[37] A.M. Elazouni, A.A. Gab-Allah, Finance-based scheduling of construction projects using integer programming, Journal of Construction Engineering and Management, 130(1) (2004) 15-24.
[38] A.M. Elazouni, F.G. Metwally, Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms, Journal of Construction Engineering and Management, 131(4) (2005) 400-412.
[39] M.M. Ali, A. Elazouni, Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities, Construction management and economics,27(9)(2009)839-856.
[40] M. Abido, A.M. Elazouni, Precedence-preserving GAs operators for scheduling problems with activities’ start times encoding, Journal of Computing in Civil Engineering, 24(4) (2009) 345-356.
[41] M. Abido, A.M. Elazouni, Multiobjective evolutionary finance-based scheduling: Entire projects’ portfolio, Journal of Computing in Civil Engineering, 25(1) (2010) 85-97.
[42] H.-K. Park, Cash flow forecasting in construction project, KSCE Journal of Civil Engineering, 8(3) (2004) 265-271.
[43] J.-H. Ock, H.K. Park, A study on the algorithm of cash flow forecasting model in the planning stage of a construction project, KSCE Journal of Civil Engineering, 20(6) (2016) 2170-2176.
[44] T. Au, C. Hendrickson, Profit measures for construction projects, Journal of Construction Engineering and Management, 112(2) (1986) 273-289.
[45] A. Elazouni, M. Abido, Contractor-finance decisionmaking tool using multi-objective optimization, Canadian Journal of Civil Engineering, 40(10) (2013) 961-971.