[1] M. Entacher, G. Winter, T. Bumberger, K. Decker, I. Godor, R. Galler, Cutter force measurement on tunnel boring machines – System design, Tunnelling and Underground Space Technology, 31 (2012): 97-106.
[2] M. Entacher, G. Winter, R. Galler, Cutter force measurement on tunnel boring machines – Implementation at Koralm tunnel, Tunnelling and Underground Space Technology, 38 (2013): 487-496.
[3] U. Ates, N. Bilgin, H. Copur, Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects, Tunnelling and Underground Space Technology, 40 (2014): 46-63.
[4] Q. Geng, Z. Wei, H. Meng, An experimental research on the rock cutting process of the gage cutters for rock tunnel boring machine (TBM), 2016.
[5] Q.-M. Gong, J. Zhao, Y.-Y. Jiao, Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters, Tunnelling and Underground Space Technology, 20(2) (2005): 183-191.
[6] Q.M. Gong, Y.Y. Jiao, J. Zhao, Numerical modelling of the effects of joint spacing on rock fragmentation by TBM cutters, Tunnelling and Underground Space Technology, 21(1) (2006): 46-55.
[7] N. Barton, TBM tunnelling in jointed and faulted rock, Balkema, Rotterdam; Brookfield, VT, 2000.
[8] S. Cheema, Development of a rock mass boreability index for the performance of tunnel boring machines, 1999.
[9] B.A. Eftekhari M., Bagherpour R., The Effect Of Operational Parameters On Penetration Rate Of A Tbm Using Artificial Neural Networks- A Case Study: Zagros Tunnel, Tunneling & Underground Space Engineering, 1(1) (2013) :29-98.
[10] J. Rostami, Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters, International Journal of Rock Mechanics and Mining Sciences, 57 (2013): 172-186.
[11] F.F. Roxborough, H.R. Phillips, Rock excavation by disc cutter, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 12(12) (1975): 361-366.
[12] D. Festa, W. Broere, J.W. Bosch, An investigation into the forces acting on a TBM during driving – Mining the TBM logged data, Tunnelling and Underground Space Technology, 32 (2012): 143-157.
[13] SCC, "Geometric Map of Amirkabir Water Conveyance Tunnel Project," Sahel Consulting Company, Tehran, 2011 (in Persian).
[14] SCC, "Geology Report and Asbuilt Maps of Amirkabir Water Conveyance Tunnel Project," Sahel Consulting Company, Tehran, 2011-2013 (in Persian).
[15] J.A. Franklin, Suggested method for determining point load strength, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 22(2) (1985): 51-60.
[16] E. Japan Society of Civil, Standard specifications for tunneling, 2006, Tunnel Engineering Committee, Tokyo, 2007.
[17] N. Bilgin, H. Copur, C. Balci, D. Tumac, M. Akgul, A. Yuksel, The selection of a TBM using full scale laboratory tests and comparison of measured and predicted performance values in Istanbul Kozyatagi-Kadikoy metro tunnels, 2019.
[18] C. T. Carranza-Torres, B. Corkum, E. Hoek, C. Carranza-Torres, Hoek-Brown failure criterion - 2002 Edition, 2002.
[19] W. Wittke, R. Druffel, C. Erichsen, J. Gattermann, J. Kiehl, D. Schmitt, M. Tegelkamp, M. Wittke, P. Wittke-Gattermann, B. Wittke-Schmitt, Stability Analysis and Design for Mechanized Tunneling, Aachen: WBI GmbH, WBI GmbH, Aachen, 2006.