[1] Y. Shin, H. Cho, K.I. Kang, Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction, Automation in Construction, 20 (2011).
[2] S. Hu, Y. Fang, Y. Bai, Automation and optimization in crane lift planning: A critical review, Advanced Engineering Informatics, 49 (2021) 101346.
[3] C. Huang, W. Li, W. Lu, F. Xue, M. Liu, Z. Liu, Optimization of multiple-crane service schedules in overlapping areas through consideration of transportation efficiency and operational safety, Automation in Construction, 127 (2021) 103716.
[4] M. Al-Hussein, M.A. Niaz, H. Yu, H. Kim, Integrating 3D visualization and simulation for tower crane operations on construction sites, Automation in Construction, 15 (2006) 554–562.
[5] T. Kim, H. Lim, S.W. Kim, H. Cho, K.I. Kang, Inclined construction hoist for efficient resource transportation in irregularly shaped tall buildings, Automation in Construction, 63 (2016) 84–95.
[6] M. Park, S. Ha, H.S. Lee, Y.K. Choi, H. Kim, S. Han, Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction, Automation in Construction, 30 (2013) 176–188.
[7] M. Jawaheri, M. Ahmadnia, M. Maghrebi, R. Ghanbari, How many lifts does a construction site need? A global optimization approach, Engineering, Construction and Architectural Management (2025).
[8] M. Ahmadnia, R. Ghanbari, M. Maghrebi, Optimized multi-tower crane layout planning: determine height, location and type to improve operational safety, Engineering, Construction and Architectural Management (2025).
[9] J. Irizarry, E.P. Karan, Optimizing location of tower cranes on construction sites through GIS and BIM integration, Electronic Journal of Information Technology in Construction, 17 (2012) 351–366.
[10] H. Safouhi, M. Mouattamid, U. Hermann, A. Hendi, An algorithm for the calculation of feasible mobile crane position areas, Automation in Construction, 20 (2011) 282–292.
[11] Y. Ji, F. Leite, Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming, Journal of Construction Engineering and Management, 146(1) (2020) 04019091.
[12] Z.S. Moussavi Nadoushani, A.W.A. Hammad, A. Akbarnezhad, Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs, Journal of Construction Engineering and Management, 143(3) (2017) 04016120.
[13] A. Tork, A real-time crane service scheduling decision support system (CSS-DSS) for construction tower crane, Ph.D. Thesis, College of Engineering and Computer Science, University of Central Florida, 2013.
[14] K. Riga, K. Jahr, C. Thielen, A. Borrmann, Mixed integer programming for dynamic tower crane and storage area optimization on construction sites, Automation in Construction, 113 (2020) 103259.
[15] K.T. Yeo, J.H. Ning, Managing uncertainty in major equipment procurement in engineering projects, European Journal of Operational Research, 171 (2006) 123–134.
[16] A. Jalali Yazdi, M. Maghrebi, J. Bolouri Bazaz, Mathematical model to optimally solve the lift planning problem in high-rise construction projects, Automation in Construction, 91 (2018) 33–45.
[17] A.J. Jalali Yazdi, M. Maghrebi, Optimizing the lift process in high-rise construction projects, Amirkabir Journal of Civil Engineering, 52(2) (2020) 383–396.
[18] P. Zhang, F.C. Harris, P.O. Olomolaiye, A computer-based model for optimizing the location of a single tower crane, Building Research and Information, 24(4) (1996) 230–237.
[19] P. Zhang, F.C. Harris, P.O. Olomolaiye, G.D. Holt, Location optimization for a group of tower cranes, Journal of Construction Engineering and Management, 125(2) (1999) 115–122.
[20] K. Philip, M. Manoj, N. Mahadevan, Optimization of construction site layout: A genetic algorithm approach, Proceedings of Computing in Civil Engineering, (1997) 710–717.
[21] H. Li, P.E.D. Love, Site-level facilities layout using genetic algorithms, Journal of Computing in Civil Engineering, 12(4) (1998) 227–231.
[22] C.M. Tam, T.K.L. Tong, W.K.W. Chan, Genetic algorithm for optimizing supply locations around tower crane, Journal of Construction Engineering and Management, 127(4) (2001) 315–321.
[23] C.M. Tam, T.K.L. Tong, GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction, Construction Management and Economics, 21 (2003) 257–266.
[24] C. Huang, C.K. Wong, C.M. Tam, Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming, Automation in Construction, 20 (2011) 571–580.
[25] L.C. Lien, M.Y. Cheng, Particle bee algorithm for tower crane layout with material quantity supply and demand optimization, Automation in Construction, 45 (2014) 182–192.
[26] J. Wang, et al., A BIM-based approach for automated tower crane layout planning, Automation in Construction, 59 (2015) 168–178.
[27] K. Wu, B. García de Soto, F. Zhang, Spatio-temporal planning for tower cranes in construction projects with simulated annealing, Automation in Construction, 110 (2020) 103060.
[28] J.K.W. Yeoh, D.K.H. Chua, Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach, Journal of Construction Engineering and Management, 143(8) (2017) 04017037.
[29] C. Huang, C.K. Wong, Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply, Automation in Construction, 85 (2018) 187–200.
[30] M. Dienstknecht, A branch and bound approach for the tower crane selection and positioning problem with respect to mutual interference, 4OR, 20 (2022) 345–368.
[31] R. Amiri, J.M.S., V.M.K., Determining the optimal capacity and location of the tower crane and material supply point in construction sites using genetic algorithm, Journal of Analysis of Structures and Earthquake Engineering, 19(2) (2022) 48.
[32] Y. Ding, The law of cosines for an n-dimensional simplex, International Journal of Mathematical Education in Science and Technology, 39 (2008) 109–117.