[1] M. Osanloo, Surface Mining Methods, Amirkabir University of Technologh Press, Tehran, Iran, 2010.(In Persian)
[2] A. Bozorgebrahimi, R. Hall, M. Morin, Equipment size effects on open pit mining performance, International Journal of Surface Mining, Reclamation and Environment, 19(1) (2005) 41-56.
[3] Q. Gu, X. Li, L. Chen, C. Lu, Layout optimization of crushing station in open-pit mine based on two-stage fusion particle swarm algorithm, Engineering Optimization, 53(10) (2021) 1671-1694.
[4] J. Stughul, “How to determine the optimum location of in-pit movable crushers”, International Journal of Mining and Geological Engineering, vol 5 , pp
143-148 , 1987 .
[5] Y. Changzhi, In-pit crushing and conveying system and Dexin pit copper haulage optimisation for ore transport, in: Fifth Large Open Pit Mining Conference, 2003, pp. 49-53.
[6] G. Konak, Onur, AH, D. Karakus, Selection of the optimum in-pit crusher location for an aggregate producer, Journal of the Southern African Institute of Mining and Metallurgy, 107(3) (2007) 161-166.
[7] M. Rahmanpour, M. Osanloo, N. Adibee, M. AkbarpourShirazi, An approach to locate an in pit crusher in open pit mines, International Journal of Engineering-Transactions C: Aspects, 27(9) (2014) 1475.
[8] M. Paricheh, M. Osanloo, Determination of the optimum in-pit crusher location in open-pit mining under production and operating cost uncertainties, in: 16th International Conference on Computer Applications in the Mineral Industries, 2016, pp. 34.
[9] M. Paricheh, M. Osanloo, M. Rahmanpour, In-pit crusher location as a dynamic location problem, Journal of the Southern African Institute of Mining and Metallurgy, 117(6) (2017) 599-607.
[10] M. Paricheh, M. Osanloo, Concurrent open-pit mine production and in-pit crushing–conveying system planning, Engineering optimization, 52(10) (2020) 1780-1795.
[11] M. Samavati, D. Essam, M. Nehring, R. Sarker, Production planning and scheduling in mining scenarios under IPCC mining systems, Computers & Operations Research, 115 (2020) 104714.
[12] D. Liu, Y. Pourrahimian, A framework for open-pit mine production scheduling under semi-mobile in-pit crushing and conveying systems with the high-angle conveyor, Mining, 1(1) (2021) 59-79.
[13] M. Shamsi, Y. Pourrahimian, M. Rahmanpour, Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying, International Journal of Mining, Reclamation and Environment, 36(2) (2022) 142-158.
[14] A. Kamrani, M.M. Badiozamani, Y. Pourrahimian, H. Askari-Nasab, Evaluating the semi-mobile in-pit crusher option through a two-step mathematical model, Resources Policy, 95 (2024) 105113.
[15] L. Findlay, R. Dimitrakopoulos, Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems, Mining, Metallurgy & Exploration, 41(4) (2024) 1677-1691.
[16] Y. Cheng, M. Nehring, M. Forbes, M. Kizil, P. Knights, A novel strategic planning and sequencing optimisation model for Fully Mobile In-Pit Crusher Conveyor (FMIPCC) systems, International Journal of Mining, Reclamation and Environment, (2025) 1-18.
[17] R. Nikbin, R. Bagherpour, E. Purhamadani, A. Taherinia, Enhancing sustainability in mining by reducing hauling energy consumption through optimization of distance and slope with semi-mobile in-pit crushers and conveyors, Scientific Reports, 15(1) (2025) 22119.
[18] A. Kamrani, H. Askari-Nasab, Y. Pourrahimian, Optimising in-pit crushing and conveying systems for cost-effective open pit mine scheduling–a sensitivity analysis on material throughput and haulage costs.
[19] M. Paricheh, Possibility of using a conveyor belt system and in pit crusher in open pit mines under conditions of production uncertainty (determinig the optimal time an place of using the system), Amirkabir University of Technology, Thesis, 2014.
[20] M. Osanloo, Design, planning and methods of surface mining, Ladan Publications, 1995.(In Persian).