[1] P.M. James, The miner and sustainable development, Mining Engineering, 51 (1999).
[2] K.F. Lane, Choosing the optimum cut-off grade Q, Colorado Sch. Min., 59 (1964) pp. 811-829.
[3] B. King, Impact of rehabilitation and closure costs on production rate and cut-off grade strategy, in: APCOM'98 (London, 19-23 April 1998), 1998, pp. 617-629.
[4] G. Ramirez-Rodriguezm, T. Rozgonyi, Evaluating the impact of environmental considerations in open pit mine design and planning, in: Proceedings of the eighth international symposium on environmental issues and waste management in energy and mineral production, 2004, pp. 125-131.
[5] J. Gholamnejad, Incorporation of rehabilitation cost into the optimum cut-off grade determination, Journal of the Southern African Institute of Mining and Metallurgy, 109(2) (2009) 89-94.
[6] M. Osanloo, F. Rashidinejad, B. Rezai, Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits, Resources Policy, 33(4) (2008) 222-229.
[7] F. Rashidinejad, M. Osanloo, B. Rezai, An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage, International Journal of Environmental Science & Technology, 5 (2008) 183-194.
[8] A. BAŞÇETİN, S. TÜYLÜ, A. Nieto, The Study of Relationships Between Economical And Environmental Parameters For Sustainable Resources Management.
[9] S. Narrei, M. Osanloo, Optimum cut-off grade in open pit mines with considering post-mining land-use revenues, in: proceedings of 20th International Symposium on Mine Planning and Equipment Selection (MPES 2011), 2011, pp. 233-247.
[10] S. Narrei, M. Osanloo, Optimum cut-off grade’s calculation in open pit mines with regard to reducing the undesirable environmental impacts, International Journal of Mining, Reclamation and Environment, 29(3) (2015) 226-242.
[11] M.R. Ahmadi, Cutoff grade optimization based on maximizing net present value using a computer model, Journal of Sustainable Mining, 17(2) (2018) 68-75.
[12] B.I.A. Muttaqin, C.N. Rosyidi, E. Pujiyanto, A Sequential Optimization Model of Cut-off Grade and Project/Location Selection in Open Pit Mining, Industrial Engineering & Management Systems, 18(3) (2019) 369-382.
[13] R. Novitasari, C. Rosyidi, A. Aisyati, A Cut-off Grade Optimization Model in Multi Product Open Pit Mining Considering Reclamation and Valuable Waste Materials, in: IOP Conference Series: Materials Science and Engineering, IOP Publishing, 2021, pp. 012019.
[14] C. Birch, Optimizing cut-off grade considering grade estimation uncertainty-A case study of Witwatersrand gold-producing areas, Journal of the Southern African Institute of Mining and Metallurgy, 122(7) (2022) 337-346.
[15] P. Biswas, R.K. Sinha, P. Sen, A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context, Resources Policy, 83 (2023) 103543.
[16] S.-h. Zhang, X. Xue, X. Liu, P. Duan, H. Yang, T. Jiang, D. Wang, R. Liu, Current situation and comprehensive utilization of iron ore tailing resources, Journal of mining Science, 42 (2006) 403-408.
[17] M. Osanloo, Mine Reclamation, Second ed., Amir Kabir University of Technology, Tehran, Iran, 2008.
[18] R.-A. Ostovar, Mine Blasting, Amir Kabir University of Technology, Tehran, Iran, 2004.
[19] M.a.M. Malek, S., Investigation of Occupational Accident Patterns in Iranian Miners, Journal of Occupational Medicine, 3(1) (2011) 28-33.
[20] J.M. Patterson, S.A. Shappell, Operator error and system deficiencies: analysis of 508 mining incidents and accidents from Queensland, Australia using HFACS, Accident Analysis & Prevention, 42(4) (2010) 1379-1385.
[21] L. Sanmiquel, M. Freijo, J. Edo, J.M. Rossell, Analysis of work related accidents in the Spanish mining sector from 1982-2006, Journal of safety research, 41(1) (2010) 1-7.
[22] M. Osanloo, Open Pit Mine Extraction, Amir Kabir University of Technology, Tehran, Iran, 2010.
[23] I.M.P.a.S. Company, 2014.
[24] E.s. company, 2014.