[1]عابدی زاده، فریماه، منوری، سید مسعود، بررسی مدیریت پسماندها در شهر صنعتی رشت، علوم محیوی سال چهارم، - . شماره چهارم ، 118- 101 ، تابستان1386
[2]en.wikipedia.org/wiki/Industrial_park.
[3]Ramanathan, R. ,“A note on the use of the analytic hierarchy process for environmental impact assessment”, Journal of Environmental Management, 63(1): pp. 27-35, 2001.
[4]Beccali, M., M. Cellura, and M. Mistretta, “Decision-making in energy planning. Application of the Electre method at regional level for the diffusion of renewable energy technology”, Renewable Energy, 28(13): pp. 2063-2087, 2003.
[5]Wu, M.C. and T.Y. Chen ,“The ELECTRE multicriteria analysis approach based on Atanassov's intuitionistic fuzzy sets”, Expert Systems with Applications, 38(10): pp. 12318-12327, 2011.
[6]Norese, M.F. ,“ELECTRE III as a support for participatory decision-making on the localisation of waste-treatment plants”, Land Use Policy, 23(1): pp. 76-85, 2006.
[7] Vetschera, R. and A.T. De Almeida ,“A PROMETHEE-based approach to portfolio selection problems”, Computers and Operations Research, 39(5): pp. 1010-1020, 2012.
[8]Brans, J.P., P. Vincke, and B. Mareschal, “How to select and how to rank projects: The Promethee method”, European Journal of Operational Research, 24(2): pp. 228-238, 1986.
[9]Chan, E.H.W., H.C.H. Suen, and C.K.L. Chan ,“MAUT-based dispute resolution selection model prototype for international construction projects”, Journal of Construction Engineering and Management, 132(5): pp. 444-451, 2006.
[10]Prato, T. ,“Multiple-attribute evaluation of ecosystem management for the Missouri River system”, Ecological Economics, 45(2): pp. 297-309, 2003.
[11]Wang, M., S.J. Lin, and Y.C. Lo. ,“The comparison between MAUT and PROMETHEE”, 2010.
[12]Karamouz, M., et al. ,“Developing a master plan for hospital solid waste management: A case study” , Waste Management, 27(5): pp. 626-638, 2007.
[13]Pires, A., N.-B. Chang, and G. Martinho, “An AHP-based fuzzy interval TOPSIS assessment for sustainable expansion of the solid waste management system in Setúbal Peninsula”, Portugal. Resources, Conservation and Recycling, 56(1): pp. 7-21, 2011.
[14]Gumus, A.T. ,“Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology”, Expert Systems with Applications, 36(2, Part 2): pp. 4067-4074, 2009.
[15]Önüt, S. and S. Soner ,“Transshipment site selection using the AHP and TOPSIS
approaches under fuzzy environment”, Waste Management, 28(9): pp. 1552-1559, 2008.
[16]M. Kemal, K., Discussion of ,“Combining AHP with GIS for landfill site selection: A case study in the Lake Beysehir catchment area (Konya, Turkey)”, Waste Management, 30, 11, 2010, 2037–2046. Waste Management, 31(6): pp. 1250-1251, 2011.
[17]Şener, Ş., E. Sener, and R. Karagüzel, “Solid waste disposal site selection with GIS and AHP methodology: A case study in Senirkent-Uluborlu (Isparta) Basin”, Turkey. Environmental Monitoring and Assessment, 173(1-4): pp. 533-554, 2011.
[18]Khorshiddoust, A.M. and Z. Adeli ,“The application of AHP method for optimum solid waste landfill site selection: A case study of Bo nab city in East Azerbaijan Province”, Iran. Journal of Environmental Studies, 35(50): pp. 27-32, 2009.
[19]Wang, G.Q., et al. ,“Optimizing the collection and transportation of municipal solid wastes based on AHP”, Zhongguo Huanjing Kexue/China Environmental Science, 28(9): pp. 838-842, 2008.
[20]Li, R.Z., J.Q. Wang, and J.Z. Qian, “Delphi-AHP method for allocation of waste loads in a region”, Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 37(1): pp. 84-88, 2005.
[21]Klang ,A., Vikman, P., Brattebø, H., “Sustainable management of demolition waste an integrated model for the evaluation of environmental, economic and social aspects, Resources”, Conservation and Recycling, pp. 38 317/334, 2003.
[22]S. H¨ uffer, T. Taeger ,“Sustainable leather manufacturing a topic with growing importance”, J. Am. Leather Chem. Assoc. 99 (10) pp. 423–428, 2004.
[23]WBCSD and United Nations Environment Programme. Cleaner Production and Eco-efficiency*/ Complementary Approaches to Sustainable Development. WBCSD: Geneva;1998.
[24] United Nations Conference on Environment and Development. Agenda 21*/An Action Plan for the Next Century. United Nations. Rio de Janeiro, Brazil; 1992.
[25] a, Y.-M.W., Y.L. b, and Z. Hua, On the extent analysis method for fuzzy AHP and its applications. European Journal of Operational Research (186): pp. 735-747, 2008.
[26]Basak Sener, M. Lutfi Suzen, and V. Doyura, Landfill site selection by using geographic information system. Environ Geol ( 49): pp. 376-388, 2006.
[27]Al-Harbi, K.M.A.-S. ,“Application of the AHP in project management”, International Journal of Project Management, (19 ): pp. 19- 27, 2001.
[28]saaty, t.l., an analytical hierarchy process. New York: MacGrave- Hill, 1980.
[29]Amiri, M.P. ,“Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods”, xpert Systems with Applications (37): pp. 6218–6224, 2010.
[30]Duen-Ren Liua and Y.-Y. Shih, “Integrating AHP and data mining for product recommendation based on customer lifetime value”, Information & Management (42): pp. 387-400, 2005.
[31]Semih Onut and S. Soner ,“Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment”, Waste Management (28): pp. 1552-1559, 2008.
[32]Shams Fallah, F., Vahidi, H., Pazoki, M., Akhavan limodehi, F., Aslemand, A., Samiee-Zafarghandi, R., “Investigation of Solid Waste Disposal Alternatives in Lavan Island Using Life Cycle Assessment Approach”, International journal of Environmental research, Int. J. Environ. Res., 7(1) pp. 155-164, Winter, 2013.