[1] supervisory report of construction projects (research and supervision of the Islamic Parliament), (in persian).
[2] Project scheduling management authored by R Amani, (in persian).
[3] N. Alamri, O. Amoudi, G. Njie, Analysis of construction delay causes in Dams projects in Oman, European Journal of Business and Social Sciences, 6(2) (2017) 19-42.
[4] H. Kamalan, A. Abedin Maghanaki, Root Cause Analysis of Delays in Dam Construction (Case Studies: Karun-3, Marun, Shafaroud and Jamishan Dams), Journal of Hydraulic Structures, 6(3) (2020) 45-58.
[5] S.A. Assaf, S. Al-Hejji, Causes of delay in large construction projects, International journal of project management, 24(4) (2006) 349-357.
[6] S. Li, A generic model of project management with Vensim, Universitetet i Agder/Agder University, 2008.
[7] S.H. Han, S. Yun, H. Kim, Y.H. Kwak, H.K. Park, S.H. Lee, Analyzing schedule delay of mega project: Lessons learned from Korea train express, IEEE Transactions on Engineering Management, 56(2) (2009) 243-256.
[8] N. Hamzah, M.A. Khoiry, I. Arshad, N.M. Tawil, A.C. Ani, Cause of construction Delay-Theoretical framework, Procedia engineering, 20 (2011) 490-495.
[9] Owolabi James, D., Amusan Lekan, M., Oloke, C., Olusanya, O., Tunji-Olayeni, P., & Owolabi Dele, P. (2014). Causes and effect of delay on project construction delivery time. International journal of education and research, 2(4), 197-208.
[10] M.H. Hagigat, A. Gorbani, (2018), Modeling the delays of construction projects based on neural network to determine the contribution of effective factors in the occurrence of delays in building construction projects in Tehran, (in persian).
[11] A. El Rahif, M. Ghale Navi, Investigating and prioritizing delay factors in construction projects by hierarchical method, according to Qahtan Ghalib Project Management Standard, (2018) ( in persian).
[12] H. Anysz, B. Buczkowski, The association analysis for risk evaluation of significant delay occurrence in the completion date of construction project, International Journal of Environmental Science and Technology, 16(9) (2019) 5369-5374.
[13] A. Monirabbasi, A. Ramezani Khansari, L. Majidi, Simulation of Delay Factors in Sewage Projects with the Dynamic System Approach, Industrial Engineering and Strategic Management, 1(1) (2021) 15-30.
[14] M. Welde, I. Bukkestein, Over time or on time? A study of delays in large government projects. Procedia Computer Science,196, (2022) 772-781.
[15] J. E. Park, Schedule delays of major projects: what should we do about it? Transport Reviews, 41(6), (2022) 814-832.
[16] G. A. Niazai, K. Gidado, Causes of project delay in the construction industry in Afghanistan. Proceedings of the EPPM, (2022).
[17] M. Akbari, D. Akbari, F. Najibi, V. Hajizadeh, Knowledge management in a project-oriented organization and its impact on reducing delays of Road Construction Projects in Southern Khorasan, Journal of Structural and Construction Engineering, 9(2) (2022).
[18] E.J. Abu Namous, INVESTIGATING THE FACTORS THAT CAUSE COST AND TIME OVERRUN IN THE RESIDENTIAL CONSTRUCTION PROJECTS IN THE UAE: PROJECT MANAGERS PERSPECTIVE, (2021).
[19] G. Siva Subramani, S. Manikanda Prabhu, R. Gowtham, & S. Dey, S,Identification of the Mitigation Methods to Be Adopted that Prevents Time Overrun in Construction Projects. In Advances in Construction Management, (2022) 403-411.
[20] M.A. Raoof, M. Rojhani, M. Rahmati, Causes of Delays in Iranian Building Construction Projects, Aut Journal of Civil Engineering, (proof) (2022).
[21] Introduction to the book Systemic Thinking (Basics, Tools and Methods), Dr. Qasim Mokhtari, (in persian).
[22] Sterman′s business dynamics book, translated by Korosh Brarpour and Parisa Mousavi, (in persian).
[23] Taken from Chapter 5 of John D. Sterman's Dynamics book, (in persian).