[1] M. Reenu, R. Kumar, S. Babu, Construction project performance model using artificial neural network, International Journal of Recent Trends in Engineering and Research (IJRTER), 3(5) (2017) 77-86.
[2] M. Khodadad Saryazdi, F. Ghasemi, V. Joiban, Methods of reviewing the causes of delay in construction projects, in: 2th National Congress of Construction Engineering and Evaluation of Civil Projects, Semnan, 2015.)in Persian)
[3] H. Karimipour, H. Zoghi, Assessing why construction projects are delayed using a mathematical model: A case study of the comprehensive water supply plan for villages in guilan province, in: The Second National Conference on Modern Urban Architecture and Development, Urmia, 2015.(in Persion)
[4] N. Ibadov, Contractor selection for construction project, with the use of fuzzy preference relation, Procedia Engineering, 111 (2015) 317-323.
[5] J. Bochenek, The contractor selection criteria in open and restricted procedures in public sector in selected EU countries, Procedia Engineering, 85 (2014) 69-74.
[6] M. Sambasivan, Y.W. Soon, Causes and effects of delays in Malaysian construction industry, International Journal of project management, 25(5) (2007) 517-526.
[7] R.F. Aziz, Ranking of delay factors in construction projects after Egyptian revolution, Alexandria Engineering Journal, 52(3) (2013) 387-406.
[8] A. Al‐Kharashi, M. Skitmore, Causes of delays in Saudi Arabian public sector construction projects, Construction Management and Economics, 27(1) (2009) 3-23.
[9] B. Greenhalgh, Introduction to construction contract management, Routledge, 2016.
[10] T. Nyoni, W.G. Bonga, Towards factors affecting delays in construction projects: A case of Zimbabwe, Dynamic Research Journals' Journal of Economics and Finance (DRJ-JEF), 2(1) (2017) 12-28.
[11] M.M. Marzouk, T.I. El-Rasas, Analyzing delay causes in Egyptian construction projects, Journal of advanced research, 5(1) (2014) 49-55.
[12] Z.K. Bangash, Analyzing the Causes of Delays in Construction Projects for Peshawar: Contractor Perception, Journal of Emerging Trends in Applied Engineering, 1(1) (2016) 13-18.
[13] M. Nasrollahi, Use F-PROMETHEE to evaluate and rank contractors civil projects, Journal of Industrial Management, 7(1) (2015) 175-188.)in Persian)
[14] H. Amin Tahmasebi, R. Tavakoli Moghadam, E. Najafi, Provide an integrated IAHP / DEA model to evaluate construction industry contractors despite inaccurate data, Production And Operations Management, 7(2) (2016) 199-216.)in Persian)
[15] V. Ayan, M. Forouzan, H. Dargahi, A. Mahdizade, M. Keyhaninezhad, Management Evaluation and prioritization of contractor selection based on TOPSIS, TOPSIS fuzzy, AHP and AHP fuzzy models, in: 2nd International Conference on Civil Engineering, Architecture and Crisis Management, Tehran, 2017.)in Persian)
[16] M. Jamali, A. Valipour, Identifying and ranking the effective criteria in selecting construction contractors in South Zagros Oil and Gas Company, in: 3rd International Conference on Civil Engineering, Architecture and Urban Design, Tabriz, 2018.)in Persian)
[17] K. Lam, S.T. Ng, H. Tiesong, M. Skitmore, S. Cheung, Decision support system for contractor pre‐qualification—artificial neural network model, Engineering Construction and Architectural Management, 7(3) (2000) 251-266.
[18] M.S. El-Abbasy, T. Zayed, M. Ahmed, H. Alzraiee, M. Abouhamad, Contractor selection model for highway projects using integrated simulation and analytic network process, Journal of Construction Engineering and Management, 139(7) (2013) 755-767.
[19] M. Hasnain, M.J. Thaheem, F. Ullah, Best value contractor selection in road construction projects: ANP-based decision support system, International Journal of Civil Engineering, 16(6) (2018) 695-714.
[20] H.A. El-khalek, R.F. Aziz, E.S. Morgan, Identification of construction subcontractor prequalification evaluation criteria and their impact on project success, Alexandria Engineering Journal, 58(1) (2019) 217-223.
[21] K. Najafi, J. Kazemi Rad, M. Ghanbari, R. Hejazi, M. Kashefiasl, Identification and Assessment of Occupational Risks in Mechanized Excavation of Metro Tunnel using the Failure Mode and Effects Analysis Technique (FMEA) Occupational Hygiene and Health Promotion Journal, 1(2) (2017) 129-142.)in Persian)
[22] M. Salmani, V. Mirchi, The role of risk management in preventing potential costs of a factory construction project, in: 6th International Project Management Conference, Tehran, 2010.)in Persian)
[23] T.C.o. Ministers, Qualification Regulations, Management and Planning Organization, 2002. )in Persian)
[24] M. Karamooz, A. Ahmadi, M. Fallahi, System Engineering, Fifth ed., Amirkabir University of Technology Publications, Tehran, 2015.)in Persian)