<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Amirkabir University of Technology</PublisherName>
				<JournalTitle>Amirkabir Journal of Civil Engineering</JournalTitle>
				<Issn>2588-297X</Issn>
				<Volume>52</Volume>
				<Issue>8</Issue>
				<PubDate PubStatus="epublish">
					<Year>2020</Year>
					<Month>10</Month>
					<Day>22</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Effect of Concurrent Use of the Six-Legged Element and Rip-Rap for Scour Control 
with Economic Considerations</ArticleTitle>
<VernacularTitle>Effect of Concurrent Use of the Six-Legged Element and Rip-Rap for Scour Control 
with Economic Considerations</VernacularTitle>
			<FirstPage>1995</FirstPage>
			<LastPage>2010</LastPage>
			<ELocationID EIdType="pii">3419</ELocationID>
			
<ELocationID EIdType="doi">10.22060/ceej.2019.15793.6032</ELocationID>
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>Mohammad</FirstName>
					<LastName>Rashki Ghaleh Nou</LastName>
<Affiliation>Ph.D Student- Hydraulic structures- Dep. of Civil Engineering- University of Sistan and Balouchestan- Zahedan</Affiliation>
<Identifier Source="ORCID">0000-0002-3923-0511</Identifier>

</Author>
<Author>
					<FirstName>Mehdi</FirstName>
					<LastName>Azhdary Moghaddam</LastName>
<Affiliation>University of Sistan and Baluchestan</Affiliation>

</Author>
<Author>
					<FirstName>Mahmood</FirstName>
					<LastName>Shafai Bajestan</LastName>
<Affiliation>Prof. Faculty of Water Science Engineering, Shahid Chamran University of Ahvaz</Affiliation>

</Author>
<Author>
					<FirstName>Hazi Mohammad</FirstName>
					<LastName>Azamathulla</LastName>
<Affiliation>Professor of Civil  &amp;amp; Environmental Engineering,
The University of  the West Indies,
St. Augustine Campus, Trinidad</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2019</Year>
					<Month>02</Month>
					<Day>08</Day>
				</PubDate>
			</History>
		<Abstract>The scour control downstream of the ski-jump spillways is one of the most important issues encountered by hydraulic engineers. In this paper, an experimental investigation was performed to evaluate the reduction in the maximum volume of the scour hole due to the concurrent use of the six-legged concrete elements (A-Jacks) and rip-rap materials in different hydraulic conditions. These elements were placed in the downstream of the ski-jump spillway. The experiments included a single size of concrete element and two sizes of rip-rap with five flow discharges and three tail-water depths. The change in tail-water depth resulted in the spillway having free, semi-submerged and submerged conditions. The results were showed that as scour depth increased, the scouring rate is significantly reduced. By simultaneous usage of concrete elements and rip-rap materials, the maximum scour volume decreased up to 100% in different hydraulic conditions as compared to the control tests. In addition, the results showed that the use of a rip-rap layer is about 80% cheaper than the coating with six-legged elements, which this difference is reduced by increasing the thickness of rip-rap layer.</Abstract>
			<OtherAbstract Language="FA">The scour control downstream of the ski-jump spillways is one of the most important issues encountered by hydraulic engineers. In this paper, an experimental investigation was performed to evaluate the reduction in the maximum volume of the scour hole due to the concurrent use of the six-legged concrete elements (A-Jacks) and rip-rap materials in different hydraulic conditions. These elements were placed in the downstream of the ski-jump spillway. The experiments included a single size of concrete element and two sizes of rip-rap with five flow discharges and three tail-water depths. The change in tail-water depth resulted in the spillway having free, semi-submerged and submerged conditions. The results were showed that as scour depth increased, the scouring rate is significantly reduced. By simultaneous usage of concrete elements and rip-rap materials, the maximum scour volume decreased up to 100% in different hydraulic conditions as compared to the control tests. In addition, the results showed that the use of a rip-rap layer is about 80% cheaper than the coating with six-legged elements, which this difference is reduced by increasing the thickness of rip-rap layer.</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Economic comparison</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Scouring</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Six-Legged Elements</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Ski-Jump Spillway</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Rip-Rap Layer</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://ceej.aut.ac.ir/article_3419_4a533591763dfa743a13affab1a85793.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
