<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Amirkabir University of Technology</PublisherName>
				<JournalTitle>Amirkabir Journal of Civil Engineering</JournalTitle>
				<Issn>2588-297X</Issn>
				<Volume>52</Volume>
				<Issue>2</Issue>
				<PubDate PubStatus="epublish">
					<Year>2020</Year>
					<Month>04</Month>
					<Day>20</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Optimizing the lift process in high-rise construction projects</ArticleTitle>
<VernacularTitle>Optimizing the lift process in high-rise construction projects</VernacularTitle>
			<FirstPage>383</FirstPage>
			<LastPage>396</LastPage>
			<ELocationID EIdType="pii">3182</ELocationID>
			
<ELocationID EIdType="doi">10.22060/ceej.2018.13868.5496</ELocationID>
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>Alireza</FirstName>
					<LastName>Jalali Yazdi</LastName>
<Affiliation>Department of Civil Engineering, Ferdowsi University of Mashhad</Affiliation>

</Author>
<Author>
					<FirstName>Mojtaba</FirstName>
					<LastName>Maghrebi</LastName>
<Affiliation>Department of Civil Engineering, Ferdowsi University of Mashhad</Affiliation>
<Identifier Source="ORCID">0000-0001-7284-9095</Identifier>

</Author>
<Author>
					<FirstName>Jafar</FirstName>
					<LastName>Bolouri Bazaz</LastName>
<Affiliation>Civil Engineering Dept. Ferdowsi University of Mashhad</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2017</Year>
					<Month>12</Month>
					<Day>26</Day>
				</PubDate>
			</History>
		<Abstract>Availability of resources, especially labor and materials, is a critical factor that directly affects the project progress in high-rise construction projects. The project management team is continually seeking to facilitate the supply-chain process to avoid delays caused by labor and construction materials unavailability. This matter is especially of vital significance in high-rise buildings that comprise numerous and repetitive activities. The challenge that arises in these projects is the optimal vertical transportation of resources, which is possible via special machinery, including tower cranes and lifts. It has been observed in the literature that the optimal planning of construction lifting equipment can lead to significant improvements in reducing The activity delays. This research develops a mathematical model that optimizes the lifts’ operational plan in high-rise buildings with multiple lift cars, using integer programming techniques.”</Abstract>
			<OtherAbstract Language="FA">Availability of resources, especially labor and materials, is a critical factor that directly affects the project progress in high-rise construction projects. The project management team is continually seeking to facilitate the supply-chain process to avoid delays caused by labor and construction materials unavailability. This matter is especially of vital significance in high-rise buildings that comprise numerous and repetitive activities. The challenge that arises in these projects is the optimal vertical transportation of resources, which is possible via special machinery, including tower cranes and lifts. It has been observed in the literature that the optimal planning of construction lifting equipment can lead to significant improvements in reducing The activity delays. This research develops a mathematical model that optimizes the lifts’ operational plan in high-rise buildings with multiple lift cars, using integer programming techniques.”</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">high-rise building</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">lift</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">hoist</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">optimization</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Integer Programming</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://ceej.aut.ac.ir/article_3182_8051a3c40561002834e59d566b7430cf.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
